Today is one of the most important days in the life cycle of the Institute of Transportation CIP.

At 1:00 p.m., the contract was officially signed with Power Construction Corporation of China Limited for the preparation of technical documentation (Building Permit Design – PGD, Detailed Design – PZI, and As-Built Design – PIO) for the substructure of the Makis metro depot (Construction of Metro BG MAKIŠ Depot in Belgrade) and in this way, the CIPTeam officially and formally became part of one of the major projects in Europe. We keep going.

It is our time… It is time for a new time…