Construction of the E-763 Belgrade – Požega highway, Surčin – Obrenovac section along the left bank of the Sava River
The technical documentation envisaged the 17.58km long highway for speed of 130km/h with 4 traffic lanes, 2 emergency lanes and central reserve. The design includes a concrete bridge over the Sava and Kolubara Rivers, 1600m long, several small bridges and 2 grade-separated crossings (“Surčin” interchange and “Obrenovac” interchange).
The following designs were completed:
– General Design with Preliminary Feasibility Study,
– Preliminary Design with Feasibility Study,
– Building Permit Design,
– Detailed Design.
Client
China Communications Construction Company Beograd JP ‘’Putevi Srbije’’
Location
Surčin - Obrenovac
Period
2017 - 2018.