Construction of the E-763 Belgrade – Požega highway, section: Preljina – Požega

The technical documentation envisaged the 0.17km long highway for speeds of 100km/h – 120km/h with 4 traffic lanes, 2 emergency lanes and central reserve. For more optimum project implementation, the Preljina – Požega section is divided into 5 subsection. The design includes 50 bridges, 3 tunnels (Laz tunnel, 2840m long; Munjino Brdo tunnel, 2750m long and Trbušani tunnel, 300m long), 3 grade-separated crossings and 19 road diversions. The following communal infrastructure is foreseen: storm sewerage, electric power infrastructure, public lighting, telecommunications.
The following designs were completed:
– Preliminary Design with Feasibility Study,
– Building Permit Design,
– Detailed Design.

Client

China Communications Construction Company ogranak Beograd / PE “Roads of Serbia”

Location

Preljina - Požega

Period

2019. - 2022.

Engaged teams