By applying BIM technology, the CIPTeam is working on modelling the existing building of the Military Medical Academy – MMA. The data from the model will be the basis for the upcoming energy renovation of the building.

The building, covering an area of 180,000 m², divided into more than 60 technical and technological units, with about 6000 rooms, represents a great challenge that the BIM CIPTeam is successfully overcoming.

This is a big step in the implementation of BIM technology in our company, which can be said to be an inevitable, unstoppable and irreversible process.