“Čortanovci” railway tunnel design
The “Čortanovci” tunnel was constructed in 2021 as part of the Project for reconstruction, modernization and construction of the Belgrade – Subotica high speed railway line. The design train speed on the tunnel section is 200 km/h. The “Čortanovci” tunnel consists of two separate tubes, 1,156.00 m long left tube and 1,086.50 m long right tube. Technical documentation level: Preliminary Design, Final design.
Client
“Serbian Railways” Public Enterprise
Location
Čortanovci
Period
2015.
Engaged teams