For the finalization of the cooperation with the German state investment and development bank – KfW Development Bank and Management4health – a leader in the field of implementation and monitoring of health projects, CIPTeam held a presentation of the progress of the BIM model of the existing building of the Military Medical Academy – MMA. The BIM model prepared by CIP will be the basis for the further preparation of the design for energy rehabilitation of the MMA, which will be implemented by m4h.

After the presentation, there was a discussion about the level of completion of the project, challenges during modeling and upcoming activities.

By creating a BIM model of the largest building in the field of healthcare in Serbia and beyond, CIPTeam demonstrates its ability to realize the greatest design challenges.