Within the preparation of technical documentation for the construction of a bridge with access traffic areas on the existing piers of the former „Franz Josef“ bridge and the reconstruction of the existing tunnel with elevators to the upper plateau of the Petrovaradin Fortress, the preparation of the Report on the geodetic monitoring of the surrounding structures and the Report on the assessment of the condition of the existing piers of the old bridge is underway.

The activities included the engagement of experts from the Department of Geodesy and the Department for Structural Engineering of the Institute of Transportation CIP on the inspection of existing structures, stabilization of control geodetic network points i.e. reference geodetic network and measurement points on the monitored structures and realization of geodetic observations in the zero – initial measurement series.