The bypass that connects the industrial zone of Gornji Milanovac with the “Takovo” interchange on the E-763 highway was put in operation on 4 October 2024, enabling the diversion of freight traffic from the central city area. The Institute of Transportation CIP prepared the planning and technical documentation, based on which the works were performed by Power China and its subcontractors: Millenium Team, Mostogradnja ING, and DIS. The total length of the road route is 9.4 km, divided into two Lots of approximately 4.7 km each, where the Lot 1 includes a new route, and Lot 2 the reconstruction of the existing Klatičevo – Takovo road. Due to the configuration of the terrain and existing structures and facilities, four bridges, one overpass, and engineering structures (reinforced concrete retaining walls and reinforced earth walls) were built.