During the implementation of the Belgrade Bypass Project – Sector C, the management of the Institute of Transportation CIP visited the site along the route of this important corridor. The CIPTeam, consisting of more than 50 top designers, was engaged in this grand Project.

So far, in accordance with defined deadlines, the preliminary geodetic surveys and geotechnical investigations were fully completed, the entire Conceptual Design (IDR) was developed, and the process of preparation of the Building Permit Design for the first operational section from Bubanj potok to the Boleč interchange is expected soon.