Design of “Šarani” road tunnel

Tunnel “Šarani” is part of E – 763 highway, sector II: Ljig – Požega, section 3: Takovo – Preljina. “Šarani” tunnel consists of two separate tubes, 938.80 m long left tube and 937.75 m long right tube which passes into 108 m long gallery at its end. The tunnel is 12 m wide and has two traffic lanes, emergency lane and footways. There will be three cross passages, one for vehicles and two for pedestrians. It is one of the longest tunnels on Corridor 11. Technical documentation level: Preliminary Design, Building Permit Design, Detailed Design.

Client

Corridors of Serbia ltd / Energoprojekt Niskogradnja plc

Location

Ljig, Požega

Period

2013.

Engaged teams