Highway section Zaljevo interchange – Sukobin is 23 km long and represents a part of the Adriatic – Ionian highway corridor. This section is a continuation of the CIP Team activities on the preparation of the technical documentation for two previously contracted highway sections (Tološi – Virpazar – 40 km long and Virpazar – Zaljevo interchange – 23 km long).
The design documentation envisages several different service facilities that enable the operation of the highway.
