At the Bačka Topola railway station, the main track of the high-speed railway line from Novi Sad to Budapest was connected by laying the last rail section.
The CIPTeam designers, together with their consortium colleagues from the China Railway Design Corporation, with whom they have been working for the last few years on the preparation of the complete technical documentation for this important European Project, proudly observed the final phases of the joint project implementation.
The length of the double-track railway section for combined traffic and speeds up to 200 km/h (Novi Sad – Subotica – State border (Kelebija)) is 108.12 kilometres. It was designed according to very demanding operability standards (TSI) and equipped with modern signalling-interlocking and telecommunication devices (ETCS-2, GSM-R).
Along the railway line alignment, 13 railway bridges were designed, including 4 bridges over the existing channels of the Danube-Tisa-Danube system. The longest structures are the viaduct on the new alignment section in the Vrbas area, 1,417 m long, and the viaduct in Mali Idjoš, 489 m long.
In addition, there are 54 level crossings in total along the high-speed railway line (40 interchanges, 11 underpasses, 27 overpasses and 2 pedestrian-bicycle subways).
The most significant architectural structures are certainly two station buildings in Novi Sad and Subotica.
The station building in Novi Sad is one of the capital structures not only of the transport infrastructure, but also a heritage of modern architecture, important for the history of architecture and urban development of Novi Sad. The railway station building is an asset that enjoys previous protection, placed on the World Modern Heritage List in 2017. It is interesting to emphasize that the existing station building in Subotica, built in 1882, has the status of a cultural asset.